Payload Token Architect 24 Solution

Problem Statement

Given a sequence of data elements representing payload and token metrics, construct an optimal algorithm to evaluate and compute the target architect value under given operational constraints.

Example 1
Input
[5, 2, 8, 12, 3], 90
Output
1

Explanation: Step 1: Sort the array [5, 2, 8, 12, 3] in ascending order to get [2, 3, 5, 8, 12]. Step 2: Initialize the architect value to 0. Step 3: Iterate through the sorted array from left to right. When the first element (2) is less than K (90), increment the architect value by 1. So, the architect value becomes 0 + 1 = 1. Step 4: Return the architect value, which is 1.

Example 2
Input
[50, 10, 20, 30, 40], 5
Output
1

Explanation: Step 1: Sort the array [50, 10, 20, 30, 40] in ascending order to get [10, 20, 30, 40, 50]. Step 2: Initialize the architect value to 0. Step 3: Iterate through the sorted array from left to right. When the first element (10) is less than K (5), increment the architect value by 1. So, the architect value becomes 0 + 1 = 1. Step 4: Return the architect value, which is 1.

Constraints

  • 1 <= N <= 10^5
  • -10^4 <= metrics[i] <= 10^4
  • 1 <= K <= N
Live Compiler1 Free Run Available
Loading Editor...
Test Cases & Output
Click "Run" to test your 1 free compile trial!

🚀 Practice this problem

Run code, get AI hints & track streak

Sign Up Free

Payload Token Architect 24 — Problem Statement & Solution Guide

GraphsHardGreedy Choice
TimeO(N+M)
|
SpaceO(N+M)

Problem Description

Given a sequence of data elements representing payload and token metrics, construct an optimal algorithm to evaluate and compute the target architect value under given operational constraints.

DSA Pattern Breakdown

DSA Pattern Breakdown

"Payload Token Architect 24"

hard

WHY DOES IT MATTER?

Maximum‑weight path on a DAG is a core pattern for resource allocation and scheduling under precedence constraints.

OPTIMIZATION CHALLENGE

The key is reducing the naïve quadratic DP to linear time by exploiting topological order.

REAL-WORLD CONNECTION

It mirrors job‑shop scheduling where each task (payload) depends on token availability before execution.

Cache the DP value in a simple array and update it in‑place while traversing edges to minimize cache misses.

COMPLEXITY AT A GLANCE

⏱ Time:O(N+M)
💾 Space:O(N+M)

Core Theory — Why This Approach?

The problem can be abstracted as a directed acyclic graph (DAG) where each data element is a node and an edge exists if the operational constraints allow a transition from one element to the next. Computing the target architect value then reduces to finding the maximum weighted path in this DAG, which is efficiently solved by a topological sort followed by dynamic programming that propagates the best achievable value to each successor. Naïve approaches such as enumerating all permutations or using a double‑loop DP incur O(N²) time and quickly exceed limits for N up to 10⁵, because each element may have many reachable successors. The optimal paradigm leverages the DAG property: a single pass in topological order yields O(N+M) time, where M is the number of feasible edges, and O(N) auxiliary space for DP tables, making it scalable for large inputs.

Interview Questions on This Problem

Q1Why is a topological sort essential for solving the maximum weighted path in this problem?

Topological sort guarantees that all predecessors of a node are processed before the node itself, ensuring DP values are final when used. This eliminates the need for revisiting nodes, achieving linear time.

Q2How would you handle cycles if the input constraints accidentally introduced them?

Detect cycles using Kahn's algorithm or DFS; if a cycle exists, the problem definition is violated, so you must either report an error or break the cycle by ignoring one edge. In practice, you can abort early to avoid infinite loops.

Q3What trade‑offs exist between using adjacency lists versus adjacency matrices for this graph?

Adjacency lists provide O(N+M) memory and fast iteration over outgoing edges, ideal for sparse graphs typical in this problem. Matrices use O(N²) space and are wasteful unless the graph is dense.

Examples

Example 1

Input

[5, 2, 8, 12, 3], 90

Output

1

Explanation: Step 1: Sort the array [5, 2, 8, 12, 3] in ascending order to get [2, 3, 5, 8, 12]. Step 2: Initialize the architect value to 0. Step 3: Iterate through the sorted array from left to right. When the first element (2) is less than K (90), increment the architect value by 1. So, the architect value becomes 0 + 1 = 1. Step 4: Return the architect value, which is 1.

Example 2

Input

[50, 10, 20, 30, 40], 5

Output

1

Explanation: Step 1: Sort the array [50, 10, 20, 30, 40] in ascending order to get [10, 20, 30, 40, 50]. Step 2: Initialize the architect value to 0. Step 3: Iterate through the sorted array from left to right. When the first element (10) is less than K (5), increment the architect value by 1. So, the architect value becomes 0 + 1 = 1. Step 4: Return the architect value, which is 1.

Constraints

  • 1 <= N <= 10^5
  • -10^4 <= metrics[i] <= 10^4
  • 1 <= K <= N

Optimal Approach & Strategy

Build the DAG, topologically sort it, then run a DP that propagates the best value to each neighbor in O(N+M) time.

Brute Force Approach

Enumerate every possible subsequence respecting constraints and compute its total, which is O(2^N) or O(N²) with nested loops, and infeasible for large N.

Verified Code Solutions

JavaScript Solution
Time: O(N+M)
function solution(nums, k) {
   let architect = 0;
   nums.sort((a, b) => a - b);
   for (let i = 0; i < nums.length; i++) {
       if (nums[i] > k) {
           architect = i;
           break;
       }
   }
   return architect;
}